Commercial, multifamily and high-rise

NRCC compliance for every kind of commercial building.

we do Title 24 / NRCC energy compliance for offices, retail, restaurants, gas stations, hotels and motels, apartments and multifamily, and your ADU is held to the same standard. That is deliberate, and it is why the small jobs come back clean.

A large desert resort with rendered masonry wings, arched openings, date palms and a long reflecting pool at golden hour
Every NRCC typeCommercial · hotels · apartments
Why this should matter to you even if you're building a garage conversion

Commercial work is a house with no margin for error

Commercial projects are where energy compliance stops being paperwork. A control strategy that fails acceptance testing holds up the certificate of occupancy on a building with tenants already signed and a loan already drawing. The tolerance for a modelling error is effectively zero.

Everything we learned doing that (checking our own assumptions, stating which numbers are measured and which are assumed, refusing to guess at an existing condition) goes into a $200 ADU report exactly the same way.

The honest version: most consultants in this trade are residential-volume shops. Nothing wrong with that. But a residential-only practice has never had to defend a model to a mechanical engineer, and it shows the first time a project is genuinely hard.
What you're actually buying: a compliance document that survives contact with a plan checker, from a practice whose harder work is commercial.
Hotels & motels

What makes hospitality different.

Four things a hotel does that an office doesn't, and each one changes the compliance model.

01

Guest room controls

HVAC and lighting have to set back when the room is unoccupied. The model takes credit for it, so the controls have to be there and have to pass acceptance testing.

02

24/7 operation

No nights-and-weekends shutdown to lean on. The schedule behind the model runs around the clock, which changes what the envelope and the equipment have to do.

03

Service water heating

Enormous relative to floor area, and often the single biggest end use in the building. Recirculation losses are where the margin quietly goes.

04

Lobby & corridor lighting

Decorative fixtures blow the lighting power allowance more often than anything else. Caught at design stage it's a spec change; caught at inspection it's a re-fit.

Building types

Building types we work on.

Most of our nonresidential work is offices, hotels, restaurants and salons. Nonresidential compliance is not one problem, though: each type below fails in its own way, and knowing which trap belongs to which building is most of the job.

A low-rise hotel with stacked balconies and date palms, lit warm at dusk beside a pool deck
Hotels & motels Guest rooms · service water · lobby lighting
A mid-rise concrete and glass building with a projecting balcony block on one elevation
Offices & apartments Lighting controls · unit-type modelling
A tall concrete residential tower seen from street level against a pale sky
High-rise Four storeys and up · nonresidential standards
RESTAURANTS

Kitchen ventilation decides the job

Type I hoods move enormous volumes of conditioned air out of the building, so makeup air, hood controls and their acceptance testing decide compliance long before the envelope does. Refrigeration and long service-water runs finish the job.

HOTELS & MOTELS

Guest rooms, around the clock

Occupancy-sensing setback in every room, no overnight shutdown to lean on, service water heating that dwarfs the floor area, and decorative lobby lighting that eats the allowance.

SALONS

Exhaust, and hot water all day

Hair and nail salons run mechanical exhaust well past what the floor area suggests, and the makeup air that replaces it has to be accounted for. Wash stations put service water heating on the critical path, and the lighting is usually decorative, which the power allowance does not care about.

GAS STATIONS

Canopy lighting and the C-store

Fuel-canopy lighting has its own power allowance and controls, separate from the building. Attached convenience stores add refrigeration and long hours, so the two get documented as one project without being modelled as one space.

OFFICES

Lighting controls and plug loads

Daylighting controls, occupancy sensing and demand response are where offices are won or lost. Open-plan layouts change after the permit, so the controls documentation has to survive a tenant reshuffle.

RETAIL & TI

Tenant improvements

Office, retail and restaurant TI, scoped to the components you are touching. And no, the existing building's compliance does not carry over to the altered components.

WAREHOUSE

Big volumes, small budgets

High-bay lighting, unconditioned versus semi-conditioned space, and dock doors. The envelope questions are simple; the lighting power density is not.

HIGH-RISE

Four storeys and up

Follows the nonresidential standards, not the residential ones. Getting that wrong at the start is an expensive month.

MIXED-USE

Two codes, one permit

Retail podium, residential above. Two sets of standards in one building, and the boundary between them is where the documentation gets argued about.

APARTMENTS

Multifamily, however it is built

Two units or two hundred, central plant or in-unit systems. Unit-type modelling, the common areas, and which side of the four-storey line the building falls on. That last one decides whether it follows the residential or the nonresidential standards.

AND MORE

If it takes an NRCC, we do it

Medical and dental suites, gyms, places of worship, schools, self-storage, auto shops. Send the drawings and you'll get a straight answer on scope and fee.

Commercial work is quoted on a call, priced from the drawings. Scope varies far too much for a single number to be honest.

Questions

About commercial and hospitality

Do hotels have different Title 24 requirements?

Yes. Hotels and motels are their own occupancy under the nonresidential standards, and the requirements reflect the fact that a guest room is a dwelling that is empty most of the time. Guest room HVAC and lighting have to shut back when the room is unoccupied, which is a control requirement most other occupancies don't carry.

Service water heating is also unusually large for the floor area, and the building runs 24 hours a day, so the load profile behind the model looks nothing like an office.

Which forms does a hotel project need?

NRCC forms rather than CF1R: NRCC-ENV for the envelope, NRCC-MCH for mechanical, NRCC-LTI for indoor lighting, plus NRCC-PRF for the whole-building performance run where the prescriptive route won't reach.

High-rise residential and mixed-use towers follow the nonresidential standards too, which surprises a lot of developers who assumed the residential path applied.

What usually goes wrong on hospitality projects?

Guest room controls and the lighting power allowance, in that order. The controls get value-engineered out late, after the model already took credit for them, and then the acceptance testing fails. The lighting allowance gets blown by decorative fixtures in lobbies and corridors that nobody counted at design stage.

Both are cheap to solve on paper and expensive to solve on site.

Can you handle a tenant improvement in an existing hotel or commercial building?

Yes, and it's a large part of the commercial work. A TI is scoped to what you're actually touching, whether that is envelope, mechanical, lighting or some combination. The trap is assuming the existing building's compliance carries over. It doesn't; the altered components are judged on today's code.

A stone-faced office block with deep glazed floors and a cantilevered top storey
NonresidentialNRCC-ENV · MCH · LTI · PRF
Ready when you are

Commercial project? Send the drawings.

we'll come back with a fixed price and a realistic date, and we'll tell you up front if the prescriptive path won't get there.

Or call (909) 914-0305 and you'll get the engineer, not a receptionist.