QII (Quality Insulation Inspection)

ESTIMATED TIME: 1 HR.

Quality Insulation Installation Inspection:

HERS TEST

ESTIMATED TIME: 1-2 HR.
  • Includes duct leakage testing, cooling coil airflow testing, and fan efficacy testing if required by Title 24 Reports.

  • CF1R, CF2R, and CF3R will be completed by Title 24 Master.

  • HERS Report will be provided if inspection is passed. CHEERS REGISTRY will the only registry that will be used.

HERS RE-TEST

Re-testing will only be available if it was performed by Title 24 Master.

Whatever it is, the way you tell your story online can make all the difference.

Our Services